Advanced Diploma of Process Plant Technology - PMA60116

TAFE Western Australia Colleges

Type of institution: TAFE Institute
Level: Vocational Education and Training (VET)
CRICOS:

The PMA60115 Advanced Diploma of Process Plant Technology is a technical qualification for technologists or para-professionals who undertake technical projects such as plant modifications either individually or as part of a project team where they have a significant technical role. They may have worked their way up through the process plant operation/technology certificate and diploma qualifications or may have entered the industry at this level, either from another industry or trade occupation.Other non-technical Advanced Diplomas are available at this level such as MSS60312 - Advanced Diploma of Competitive Systems and Practices.

Structure

  • 15 units: 4 core
  • 11 elective

Subjects

  • Coordinate welfare support activities in response to an incident
  • Manage corporate media requirements in a crisis
  • Use structured problem-solving tools
  • Assist in implementing a proactive maintenance strategy
  • Build partnerships to improve incident response capacity
  • Operate remote production facilities
  • Conduct and assess incident exercises
  • Plan plant preparation and isolation
  • Develop plant documentation
  • Trial new process or product
  • Coordinate pipeline projects
  • Implement and monitor environmentally sustainable work practices
  • Solve colour problems
  • Provide operational expertise to a project team
  • Commission/recommission plant
  • Contribute to WHS management system
  • Undertake value analysis of product or process costs in terms of customer requirements
  • Assess competence
  • Plan assessment activities and processes
  • Debottleneck plant
  • Apply statistics to operational processes
  • Optimise production systems
  • Develop a decorative coating
  • Control the process during abnormal situations
  • Analyse equipment performance
  • Develop a colour formulation
  • Facilitate breakthrough improvements
  • Identify faults in electronic control
  • Manage a crisis
  • Manage plant shutdown and restart
  • Process and record information
  • Determine mass transfer loads
  • Manage people relationships
  • Determine and establish information collection requirements and processes
  • Participate in environmentally sustainable work practices
  • Develop a proactive maintenance strategy
  • Ensure process improvements are sustained
  • Develop the application of enterprise control systems in an organisation
  • Develop incident containment tactics
  • Coordinate permit process
  • Provide surface coatings application advice
  • Manage utilities
  • Coordinate incident response
  • Plan plant shutdown
  • Develop strategies for more sustainable use of resources
  • Facilitate and improve implementation of 5S
  • Decommission plant
  • Determine energy transfer loads
  • Review procedures to minimise environmental impact of process
  • Contribute to safety case
  • Match and adjust colour
  • Improve cost factors in work practices
  • Apply physiochemical knowledge to select raw materials for surface coatings
  • Determine and improve process capability
  • Manage environmental management system
  • Develop a non-decorative coating or ink
  • Interpret process plant schematics
  • Manage workplace learning
  • Respond to abnormal process situations
  • Facilitate the use of planning software systems in a work area or team
  • Design equipment and system modifications
  • Work safely
  • Manage emergency incidents
  • Maintain WHS management system
  • Coordinate maintenance
  • Develop and manage sustainable energy practices
  • Manage 5S system in an organisation
  • Manage wells and gathering systems
  • Minimise environmental impact of process
  • Participate in HAZOP studies
  • Coordinate plant shutdown
  • Facilitate implementation of competitive systems and practices
  • Operate complex control systems
  • Plan and design tailings management facilities
  • Develop first aid procedures and manage resources
  • Implement improvement systems in an organisation
  • Mistake proof an operational process
  • Issue work permits
  • Achieve work outcomes
  • Monitor and operate tailings management facilities
  • Undertake proactive maintenance analyses
  • Maintain quality system and continuous improvement processes within work or functional area
  • Optimise cost of a product or service
  • Manage diversity
  • Optimise process/plant area
  • Establish incident response preparedness and response systems
  • Manage change
  • Identify problems in fluid power system
  • Lead team culture improvement
  • Develop and monitor quality systems
  • Monitor legal compliance obligations during incidents
  • Participate in assessment validation
  • Undertake process capability improvements
  • Modify plant
  • Develop WHS management system
  • Develop and maintain community relationships
  • Manage relationships with non-customer external organisations
  • Obtain representative samples in accordance with sampling plan
  • Develop workplace policy and procedures for environmental sustainability
  • Manage risk
  • Commission wells and gathering systems
  • Audit incident preparedness and established response systems
  • Assess risk

Study information

CampusFeesEntryMid year intakeAttendance
Munster (ACEPT) No

Related courses

Browse more courses
Is the information on this page correct? Request update
Enquire about this course
You must agree before submitting.

Become a member

Already a member? LoginForgot password?

Join the conversation